# VGM (Verified Gross Mass)

> VGM is the verified gross mass of a packed container. Under the SOLAS rules of the International Maritime Organization, in force since 1 July 2016, the shipper must provide it to the carrier before the container is loaded on a ship.

## VGM at a glance

| Aspect | Detail |
| --- | --- |
| What it is | The verified gross mass of a packed container |
| Rule | SOLAS Chapter VI, in force 1 July 2016 |
| Who provides it | The shipper, before the container is loaded |
| Includes | Cargo, packing, pallets and the container tare weight |
| Deadline | Set by each carrier or terminal |

The gross mass is the weight of the cargo, packing, pallets and dunnage plus the tare weight of the container. The shipper provides it in writing, usually on the shipping instructions or a separate declaration, and the carrier and terminal use it for stowage planning.

Carriers and terminals set their own cut-off times and formats for the VGM, so ask your freight forwarder what is required.

## Key points

- The shipper named on the bill of lading is responsible for the VGM.
- Include the container tare weight, not only the cargo.
- Submit the VGM before the carrier's cut-off time.
- A container without a VGM is generally not loaded.

## How VGM works

1. Pack and seal the container.
2. Weigh the packed container, or add up the weights of the cargo, packing and container tare by an approved method.
3. Send the VGM in writing to the carrier before its cut-off.
4. Keep a record of how the weight was determined.

## Example

A tile exporter in Vietnam packs a 20 ft container. The cargo weighs 24,800 kg, the pallets and packing 600 kg and the container tare 2,150 kg, so the VGM sent to the carrier is 27,550 kg.

## Things to watch for

- Sending the cargo weight without the container tare.
- Missing the carrier's VGM cut-off.
- Estimating the weight instead of weighing it or calculating it by an approved method.

## Questions

### Who must provide the VGM?

The shipper named on the bill of lading. A forwarder may submit it for you, but the shipper stays responsible.

### What happens without a VGM?

The container is generally not loaded on the ship, which can delay your shipment and add charges.

## Related terms

- [Bill of lading](https://www.exporters-club.com/glossary/bill-of-lading.md)
- [Packing list](https://www.exporters-club.com/glossary/packing-list.md)
- [Freight forwarder](https://www.exporters-club.com/glossary/freight-forwarder.md)

## Related guides

- [Shipping container sizes and dimensions: 20 ft, 40 ft and 40 ft high cube](https://www.exporters-club.com/guides/shipping-container-sizes.md)
- [Bill of lading template and example explained](https://www.exporters-club.com/guides/bill-of-lading-template.md)
- [Packing list template and what to include](https://www.exporters-club.com/guides/packing-list-template.md)

## Sources

- [International Maritime Organization (IMO): SOLAS and verified gross mass](https://www.imo.org/)
- [World Shipping Council (WSC): container weight verification](https://www.worldshipping.org/)

---
Canonical page: https://www.exporters-club.com/glossary/vgm
Last updated: 2026-11-18
General information, not legal, tax or customs advice.
Join Exporters Club, the done-for-you service for exporters: https://www.skool.com/exporters-club-3534/about?utm_source=website&utm_medium=cta&utm_campaign=markdown&utm_content=%2Fglossary%2Fvgm
